Hole depth 2,846 m MD · Formation: Andesite fractured zone
Blind drilling active · 8½ in open hole
Total loss at 2,460 m MD. No measurable surface return; injected liquid and air are entering the fractured formation. Continue only inside the approved hydraulic and mechanical envelope.
0 GPM RETURN
285 GPM
318 scfm
142 bar
0.910 sg
GT-04 well schematic
As-drilled · not to scale
Flow path: aerated fluid travels down the drill string, exits through the bit, cleans the bottom-hole interval, and is discharged into the fracture network. No annular return reaches surface during the blind-drilling phase.
Directional trajectory
MD · TVD · departure
Survey control: MWD surveys every stand in the build section and every 90 m in hold. Blind drilling does not remove the requirement to monitor inclination, azimuth, dogleg severity, torque, and drag.
Blind-drilling pressure window
Pore ECD Fracture
TD margins: ECD 0.910 sg; pore equivalent 0.860 sg; fracture gradient 1.020 sg. Lower margin 0.050 sg and upper margin 0.110 sg. Live response overrides the static model when the formation takes fluid.
Drilling parameters by hole section
GT-04 blind-drilling program
Interval MD
Hole / bit
Mode
WOB
RPM
Liquid flow
Air
SPP
Target ROP
ECD
0–80 m
26 in · tricone
Conventional
5–10 klbf
40–60
800 GPM
0 scfm
25–45 bar
20–35 m/h
1.08–1.12 sg
80–600 m
17½ in · PDC
Conventional
20–35 klbf
80–100
750 GPM
0 scfm
55–85 bar
20–30 m/h
1.08–1.12 sg
600–1,800 m
12¼ in · PDC
Aerated transition
20–32 klbf
70–90
500 GPM
0–120 scfm
90–125 bar
15–24 m/h
0.96–1.04 sg
1,800–2,846 m
8½ in · PDC + motor
Blind / total loss
12–22 klbf
55–70
285 GPM
318 scfm
132–152 bar
8–14 m/h
0.89–0.94 sg
Current blind-drilling parameter envelope
Control-room action limits
Mechanical set pointWOB 18 klbf · RPM 62 · torque 14.8 kft·lbf · ROP 11.8 m/h. Adjust one parameter at a time and observe at least one connection cycle.
Hydraulic set point285 GPM liquid · 318 scfm air · SPP 142 bar · ECD 0.910 sg. Ramp air in controlled steps; confirm pressure stabilization.
STOP / reassess triggersSPP ±20 bar from baseline, torque +25%, severe vibration, gas/H₂S escalation, unexpected pit gain, compressor trip, or loss of pressure telemetry.