GT-04 · Aerated Drilling Control

Hole depth 2,846 m MD · Formation: Andesite fractured zone

JSON data package

Portable operator snapshot

Import simulator output to update live indicators, alarm states, and shift logs. Export the current operator package as JSON for audit and the next shift.

One-click reporting

Control-room ready

Create a printable PDF report or a PNG operator snapshot with the current well status, timestamp, alarm count, and recommended action.